skip to Main Content

Rig move and location data will be reviewed, and an assessment is made of the suitability of the rig at the proposed location. Suitability surveys of the rig and towing vessels will be carried out. A towage certificate of approval is issued for the rig move once preparations have been completed and the rig is ready to start the tow.

The Tow Master attends onboard during the rig move and will monitor jacking, transit, pre-load or anchoring from departure until the rig is safely installed at the new location. Rig Movers, Master Mariners, OCM’s and engineers have the expertise to ensure operations are conducted safely. Our personnel has a high level of experience from deep water operations with both fiber ropes and chains.